Graphic depicting the Keystone Corridor and stations from Pittsburgh to Philadelphia. Link To Harrisburg Transportation Center Station Page Link To Middletown Station Page Link To Elizabethtown Station Page Link To Mount Joy Station Page Link To Lancaster Station Page Link To Parkesburg Station Page Link To Coatesville Station Page Link To Downingtown Station Page Link To Exton Station Page Link To Paoli Station Page Link To Ardmore Station Page Link To Philadelphia -30th Street Station Page
Graphic depicting the Keystone Corridor and stations from Harrisburg to Philadelphia.

 ‭(Hidden)‬ Content Editor ‭[3]‬

  
  
Picture Size
  
  
Description
Thumbnail
Web Preview
Coatesville_IMG_8703.jpgCoatesville_IMG_8703450 x 600301 KB 1/23/2020 8:14 PM
New streetlights and sidewalk (January 2020)
New streetlights and sidewalk (January 2020)
Coatesville_IMG_8699.jpgCoatesville_IMG_8699600 x 370213 KB 1/23/2020 8:13 PM
Looking south from Lumber Street (January 2020)
Looking south from Lumber Street (January 2020)
Coatesville_IMG_8610.jpgCoatesville_IMG_8610600 x 370315 KB 1/23/2020 8:11 PM
Looking north toward Lumber Street (December 2019)
Looking north toward Lumber Street (December 2019)
Coatesville_IMG_8618.jpgCoatesville_IMG_8618600 x 370263 KB 1/23/2020 8:06 PM
ADA ramps, sidewalk, and driveway aprons poured (December 2019)
ADA ramps, sidewalk, and driveway aprons poured (December 2019)
Coatesville_IMG_8669.jpgCoatesville_IMG_8669600 x 370223 KB 1/23/2020 8:04 PM
Looking south from Diamond Street--pavement base course (Dec 2019)
Looking south from Diamond Street--pavement base course (Dec 2019)
Coatesville_IMG_8652.jpgCoatesville_IMG_8652600 x 370279 KB 1/23/2020 8:01 PM
Looking north from Diamond Street--excavation for stormwater improvements (Dec 2019)
Looking north from Diamond Street--excavation for stormwater improvements (Dec 2019)
Coatesville_4thAve_IMG_8584.jpgCoatesville_4thAve_IMG_8584600 x 370281 KB 12/23/2019 4:52 PM
Paving in progress (December 2019)
Paving in progress (December 2019)
Coatesville_4thAve_IMG_8561.jpgCoatesville_4thAve_IMG_8561600 x 370249 KB 12/23/2019 4:53 PM
New curb and pavement (December 2019)
New curb and pavement (December 2019)
Coatesville_4thAve_IMG_8464.jpgCoatesville_4thAve_IMG_8464600 x 370266 KB 12/23/2019 4:59 PM
Concrete curb installed between Lincoln Hwy and Fleetwood (Nov 2019)
Concrete curb installed between Lincoln Hwy and Fleetwood (Nov 2019)
Coatesville_4thAe_IMG_8475.jpgCoatesville_4thAe_IMG_8475600 x 370269 KB 12/23/2019 4:58 PM
New concrete curb (November 2019)
New concrete curb (November 2019)
Coatesville_4thAve_IMG_8412.jpgCoatesville_4thAve_IMG_8412600 x 370264 KB 12/23/2019 5:00 PM
Excavation between Chestnut and Fleetwood (November 2019)
Excavation between Chestnut and Fleetwood (November 2019)
Coatesville_4thAve_IMG_8400.jpgCoatesville_4thAve_IMG_8400600 x 370281 KB 12/23/2019 5:00 PM
Preparing for concrete curb placement (November 2019)
Preparing for concrete curb placement (November 2019)
Coatesville_4thAve_IMG_8388.jpgCoatesville_4thAve_IMG_8388600 x 370244 KB 12/23/2019 5:01 PM
Sidewalk excavation near Chestnut Street (November 2019)
Sidewalk excavation near Chestnut Street (November 2019)
Coatesville_4thAve_IMG_8380.jpgCoatesville_4thAve_IMG_8380450 x 600325 KB 12/23/2019 5:05 PM
Old sidewalk removed between Lincoln Hwy and Chestnut (Nov 2019)
Old sidewalk removed between Lincoln Hwy and Chestnut (Nov 2019)
Coatesville4thAve-IMG_8413.jpgCoatesville4thAve-IMG_8413600 x 370254 KB 11/15/2019 10:14 AM
Looking north, old pavement removed (November 2019)
Looking north, old pavement removed (November 2019)
Coatesville4thAve-IMG_8343.jpgCoatesville4thAve-IMG_8343600 x 370265 KB 11/15/2019 10:13 AM
Looking south, old pavement removed (October 2019)
Looking south, old pavement removed (October 2019)
Coatesville4_IMG_8124.jpgCoatesville4_IMG_8124450 x 600326 KB 8/12/2019 9:58 AM
BEFORE: East sidewalk looking north (May 2019)
BEFORE: East sidewalk looking north (May 2019)
Coatesville4_IMG_8108.jpgCoatesville4_IMG_8108450 x 600292 KB 8/12/2019 9:55 AM
BEFORE: West sidewalk looking south (May 2019)
BEFORE: West sidewalk looking south (May 2019)
Coatesville4_IMG_8143.jpgCoatesville4_IMG_8143600 x 370254 KB 8/12/2019 10:07 AM
BEFORE: Looking north between E. Chestnut St. and E. Diamond St. (May 2019)
BEFORE: Looking north between E. Chestnut St. and E. Diamond St. (May 2019)
Coatesville4_IMG_8076.jpgCoatesville4_IMG_8076450 x 600292 KB 8/12/2019 10:06 AM
BEFORE: 4th Avenue between Fleetwood and Lumber, looking north (May 2019)
BEFORE: 4th Avenue between Fleetwood and Lumber, looking north (May 2019)
Coatesville4_IMG_8066.jpgCoatesville4_IMG_8066600 x 370226 KB 8/12/2019 10:10 AM
BEFORE: Looking south between Fleetwood St. and Lumber St. (May 2019)
BEFORE: Looking south between Fleetwood St. and Lumber St. (May 2019)
Coatesville4_IMG_8072.jpgCoatesville4_IMG_8072450 x 600369 KB 8/12/2019 9:41 AM
BEFORE: 4th Avenue looking south (May 2019)
BEFORE: 4th Avenue looking south (May 2019)

 Project Highlights

Purpose

The 4th Avenue Streetscaping Project will improve ADA accessibility, expand bicycle and pedestrian facilities, improve traffic operations, and enhance aesthetics and safety between the new train station site and downtown Coatesville. The project initiates transit-oriented development and promotes area-wide revitalization.
 

​Description

Streetscaping along the four-block stretch of 4th Avenue between Fleetwood Street at the train station and Lincoln Highway (Route 30) is being completed in coordination with the train station development project. In addition to repaving 4th Avenue, the streetscaping initiative includes:


status

Construction began in September 2019. By December, the block between Fleetwood Street and Lumber Street had opened to traffic.
 

Funding Partners

The project is being​​ led by the City of Coatesville Redevelopment Authority with funding from PennDOT and the Federal Transit Administration.